The study established size and location of shunt reactor(s) for the 248 km long 500 kV double circuit line between the 330 MW Thar Energy Limited Coal Fired Power Plant (TEL CFPP) and the 500 kV switchyard of the Matiari HVDC Converter station.
A standalone power system model was developed to assess shunt reactor requirements at TEL CFPP and Matiari ends and to control voltage profile of the line under different generation dispatch and operating configuration options.